October 9, 2018


Planning for haulout. Moved the dinghy and cleaned the bottom, tied her down and made some other preparations for backlash from Hurricane Michael, which might be lots of winds and rain. Boat was pulled about 4:30, sprayed the bottom, was in better shape than suspected. Hopefully by Sat. we can have her soda blasted.

Dockage $0.00
Engine – 0 hrs

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s